Title Page

  • Reference

  • Conducted on

  • Conducted by

  • Position/ Job Role

  • Site Location
  • Site Name

  • Project Name

  • Principle Designer (PD)

  • Principle Contractor (PC)

Pre-construction Information Checklist

General Arrangements

  • Have Alpheus made formal appointments by letter to the PD & PC

  • Why not

  • Attach letters

  • Notifiable definition - last longer than 30 working days and have more than 20 workers working at the same time at any one point or will exceed 500 person days

  • Is the project notifiable

  • Has an online F10 notification form been submitted to HSE to notify them of commencement of work

  • Explain why this has not been submitted

  • Have you checked that the principal designer (PD) has the capability and necessary skills, knowledge, training and experience to fulfil their duties under CDM

  • Have you checked that the principal contractor (PC) has the capability and necessary skills, knowledge, training and experience to fulfil their duties under CDM

Project Description

  • Is there a “client brief” including a description of the project, reasons for the work and design vision

  • Are drawings available

  • Do the PC/ PD have Client details including key contacts

  • Has a schedule of the key activities for the project been produced

  • Do the PC/ PD know the expected start and finish dates and any other milestone dates

  • Do the PC/ PD know programme details

  • Have Alpheus allowed time for work planning after the appointment of key contractors

  • Have Alpheus allowed adequate resources and time to each stage of the project

  • Has Alpheus provided details of existing records and plans to the PD/ PC

Client’s Considerations and Management Requirements

  • Has a construction phase plan (CPP) been adequately developed and reviewed by Alpheus

  • Explain why

  • Have arrangements been made for communication and liaison between the parties involved, e.g. regular meetings

  • Are security provisions and requirements, e.g. access control, clear to the PD/ PC

  • Are you satisfied that suitable welfare & first aid facilities have been made available for use by contractors on site

  • Are any facilities and equipment which are to be made available, such as anchor points and lifting equipment suitable

  • Are the Supervision levels to be provided on site by the PD/ PC adequate

  • Have Alpheus provided any rules regarding parking, traffic routes, vehicle movement restrictions to the PD/ PC

  • Have permit-to-work arrangements been agreed with the PD/ PD

  • Have site fire safety requirements and emergency procedures been agreed with the PD/ PC

  • Have any restrictions concerning access, storage, waste and deliveries been discussed with the PD/ PC

  • Have any smoking restrictions on site been discussed with the PD/ PC

  • Have any height or weight restrictions on site been discussed with the PD/ PC

Hazards

  • Have details of existing “confined spaces” on the site been discussed with the PD/ PC

  • Have details about the location of asbestos-containing materials on site been discussed with the PD/ PC

  • Have any other hazardous materials on site been discussed with the PD/ PC

  • Have any adjacent land uses, where applicable, been discussed with the PD/ PC

  • Have any hazardous or dangerous materials stored on site been discussed with the PD/ PC

  • Have location of existing services including overhead lines and buried services been discussed with the PD/ PC

  • Has information about ground conditions where this is relevant to the job (e.g. excavation) or the safe use of plant been discussed with the PD/ PC

  • Have details about existing structures to the extent that it is relevant to the work? (including relevant information from any existing health and safety file) been discussed with the PD/ PC

  • Has information about past incidents and ground movements which may have affected the stability of structures been discussed with the PD/ PC

  • Have details of any contaminated land been discussed with the PD/ PC

  • Have any other health or safety hazards arising from the client’s (our) activities been discussed with the PD/ PC

Design Issues

  • Have any significant design assumptions been discussed with the PD/ PC

  • Have suggested work methods, sequences or control measures put forward by those acting as designers been discussed with the PC

  • Have arrangements for co-ordination of ongoing design work and handling design changes been discussed with the PD/ PC

  • Has significant residual risks identified at the design stage but which could not be eliminated been discussed with the PC

  • Have materials requiring particular precautions in their use been discussed with the PD/ PC

The Health and Safety File - projects involving more than one contractor only

  • Has the format for the health and safety file and its content been agreed with the PD/ PC

Comments

  • Any further comments

Sign Off

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.