Title Page
-
Conducted on
-
Location
-
Customer Name
Pre Set up
-
Have you put down the protective sheets before starting work? (Photos required)
Warranty Required Photos
-
Warranty Required Photos
Warranty Required Photos
-
Please take the required photos below as we need these for the Warranty
-
First layer of Mesh around windows and doors (**Photos required of all windows and doors**)
-
First layer of Mesh around corners of Park Home (**Photos required**)
-
Mesh showing through top two thirds of render (**Photos required**)
-
Stress patches around windows MUST BE after the layer of mesh (**Photos required of Stress Patches around ALL windows**)
-
Have the window sills been fitted? And are they 40mm from the wall? (1 photo required)
Other Photos + Final Stage
-
Other Photos + Final Stage
Other photos and checklist
-
Do all lights have the grey wago box fitted? (**Photos required**)
-
Does the door bell cable have the grey wago box fitted (**Photos required**)
-
Are the downpipes back on? (Photos required)
Park Home Mesh and Render Final Stage
-
Take photos of all elevations of the Park Home now Mesh and Rendered (Basecoat Stage) (10 photos required
-
Have 2 tempoary lights been installed for the customer? (Photos required if applicable)
-
Has the home been left in a tidy state?