Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has a risk assessment and method statement been prepared
-
Is area prepared for this element
-
Check that services works have been completed
-
Have all service holes been made good through walls and floors
-
Provide datum height for all ceilings
-
Check if permanent access panels are required
-
Ensure sufficient lighting is provided and maintained
-
Check the height of the completed ceiling from datum
-
Check the general level of the ceiling
-
Check lighting and ventilation grill apertures for alignment
-
Carry out visual check of ceiling metalwork support for stability
-
Check the line of the ceiling where ceiling abuts each wall
-
Check the quality of surface finish to taped joints, service penetrations and screw fixings
-
Check that top of ceiling is clear of debris
-
Has work area been left clean
-
Check that ceiling contractor has not damaged any wall surfaces
-
Check that the ceiling contractor has not disturbed any above ceiling services