Title Page
-
Conducted on
-
Prepared by
-
Location
-
Check type, shape, colour and dimensions
-
Check for handling damage and repair work
-
Check all surfaces for cracks
-
Ensure there is no exposed reinforcement
-
Ensure that exposed steel at end is protected
-
Ensure items are clearly identified
-
Ensure correct methods of unloading, storage, handling and fixing
-
Check relevant items have design approval
-
Has a risk assessment & method statement been prepared
-
Is the area ready and clear of other trades
-
Have DPM requirements been checked
-
Check that all service holes are in correct positions
-
Check that solid blocks are fitted in correct positions
-
Are all infill floor blocks fit for purpose
-
Do floor beams restrict any wall cavities
-
Are all floor blocks fully seated
-
Check top level of precast floor at camber
-
Check for excessive gaps between units
-
Check provision made for precast stairs
-
Check that the work areas are left clean