Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre-Installation
-
Are the drawings construction issue?
-
Are datums in place provided by the MC?
Installation
-
Is the sub-grid layout replaced as per the latest drawing?
-
Have lines / lasers been used to maintain a plumb cladded elevation?
-
Have aluminium shims been used where applicable?
-
Have movement joints been maintained?
-
Have fixings been used in accordance with the latest fixing schedule?
Sign Off
-
A2O Manager Sign Off
-
Weston Homes Manager Sign Off