Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre-Installation
-
Are the drawings approved and construction issued?
-
Have the panels been stored safety and sorted as per the latest drawings?
Installation
-
Are datums in place and provided by the MC?
-
Has the setting out been complete to maintain accurate lines down the building?
-
Has 10mm been maintained around the panel?
-
Have the fixings used been in accordance with the latest fixing schedule?
-
Has the fixing pattern been replicated as per the manufactures guidelines?
-
Have vent holes been installed using the stencils provided and allow for air to pass uninterrupedly to the vent boxes?
-
Have any cuts to the panel been done neatly using a diamond blade?
-
Has black tape been added to the rails where there is a panel joint?
Sign off
-
A2O Manager Sign Off
-
Weston Homes Manager Sign Off