Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Date & Time:
-
Application No:
-
Address:
-
LOT No: DP No:
-
The work inspected:
- Satisfactory
- Satisfactory SUBJECT TO: Rectification of the non-conformances & instructions noted below
- NOT satisfactory: The non-conformacnes & instructions noted below must be rectified and a re-inspection is required
-
Council Officer:
-
"Yes" denotes compliance
"no" denotes non- with BCA or Council requirements
"N/A" denoted not applicable -
SITE CONTROLS - General
-
SCO1 - Builders sign erected
-
SCO2 - PCA sign erected
-
SCO3 - Toilet on site
-
SCO4 - Sedimentation controls in place & appropriate
-
Single site access managed
-
SITE CONTROLS - Earthworks
-
SCO5 - Unprotected cut battered correctly (<2m H:L)
-
SCO6 - Unprotected fill battered correctly (<2m H:L)
-
SCO8- Excavations DO NOT effect adjacent structures
-
CONSENT CONDITIONS & PREVIOUS INFNECTIONS
-
SCO9 - DA conditions complied with
-
SC10 - Previous inspections instructions complied with
-
REINFORCED BLOCKWORK
Area inspected "Y" denotes full inspection
"X" denotes part inspection -
BW01 - PIERS/COLUMNS: Area inspected
-
BW02 - WALLS/STRIPS: Area inspected
-
BW03 - Site installation as per plan
-
BW04
-
Piers and Columns
-
BW05 - Piers/columns dimensions as per plan
-
BW06 - Steel/anchors installed as per plan
-
BW07 - Starter bars over-lap with wall reinforcement> 450mm
-
BW08 - Concrete grade as per plan
-
BW09
-
BW10
-
Walls
-
BW11 - Wall dimensions as per plan
-
BW12 - Steel/anchors as per plan
-
BW13 - Vapor barrier as per plan
-
BW14 - Starter bars over-lap with wall reinforcement >450mm
-
BW15 - Sub soil drainage and diversion as per plan
-
BW16 - Concrete grade as per plan
-
BW17
-
BW18
-
BW19
-
BW20
-
OTHER INSTRUCTIONS & NOTES: