Isolate Dampers and Fans
PPE Required for ActivityTask
-
Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots & gloves
Closing Off Airflow Dampers and Isolate Fans
-
Sequence of Basic Steps: Describe each step in the activity – most will have 4-8 steps. Follow the flow of the product or process.
Step 1
-
Identify Dampers to be closed off
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
1a Falling Debris
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Use Correct PPE
-
Level of Control
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
-
1b Working at Height
-
Ensure that elevated work platform (ladder, scaffold, scissor lift) is in good condition
-
Level of Control
-
Training and competency
-
Level of Control
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.
Step 2
-
Isolate Fans
Potential hazards and risks Describe the key hazards and risks for each step – there will normally be more than one per step. Number each hazard e.g 1a, 1b, 1c; 2a, 2b, 2c.
-
1a Electrical Hazards
-
Initial Risk Assessment - Before the controls are in place. Refer to the risk assessment matrix
-
Control methods and level of control Describe the key/significant way to control the risk and then refer to the hierarchy of controls
-
Use correct PPE: Hard Hat, Hi Visibility Vest, Safety Glasses, Safety boots, overalls & gloves
-
Level of Control
-
Ensure electrical circuits are isolated from the main board prior to isolating power from fans
-
Level of Control
-
Ensure all correct PPE is used as per the safe work method statement.
-
Level of Control
-
Ensure efficient methods are carried out to prove, test, prove when dealing with live electrical cables/terminations
-
Level of Control
-
Under no circumstance will any unauthorised employee or subcontractor engage in any Live Work. Once all testing has been carried out and sub circuit commissioning sheets have been completed, Electrical supervisor can issue Electrical COC
-
Residual risk assessment After all controls are in place. Refer to the risk assessment matrix.