Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

Setting Out

  • Setting out of general metal framing checked (Checked by Sub-Contractor)

  • Setting out of general metal framing checked (Checked by Ventry)

  • Setting out of critical dimensions checked (Checked by Sub-Contractor)

  • Setting out of critical dimensions checked (Checked by Ventry)

  • Installation of head tracks prior to M&E unistrut (Checked by Sub-Contractor)

  • Installation of head tracks prior to M&E unistrut (Checked by Ventry)

  • Deflection head as per approved detail (Checked by Sub-Contractor)

  • Deflection head as per approved detail (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

1st Fix Installation

  • Stud centres fixed at correct centres and compatible with sheet size (Checked by Sub-Contractor)

  • Stud centres fixed at correct centres and compatible with sheet size (Checked by Ventry)

  • DPM fixed below sole plates, as specified for moisture control (Checked by Sub-Contractor)

  • DPM fixed below sole plates, as specified for moisture control (Checked by Ventry)

  • Sole plate correctly fixed (Checked by Sub-Contractor)

  • Sole plate correctly fixed (Checked by Ventry)

  • Main batten/stud centres correct and studs properly aligned (Checked by Sub-Contractor)

  • Main batten/stud centres correct and studs properly aligned (Checked by Ventry)

  • Correct fixings used and all members secure (Checked by Sub-Contractor)

  • Correct fixings used and all members secure (Checked by Ventry)

  • Noggins/special reinforcements required for other trades signed off (Checked by Sub-Contractor)

  • Noggins/special reinforcements required for other trades signed off (Checked by Ventry)

  • Services within or behind studwork fully completed before closing with 2nd skin (Checked by Sub-Contractor)

  • Services within or behind studwork fully completed before closing with 2nd skin (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

2nd Fix Installation

  • Insulation required is provided before plasterboard lining applied (Checked by Sub-Contractor)

  • Insulation required is provided before plasterboard lining applied (Checked by Ventry)

  • Bracing required has been correctly provided (Checked by Sub-Contractor)

  • Bracing required has been correctly provided (Checked by Ventry)

  • Beads and accessories correctly incorporated (Checked by Sub-Contractor)

  • Beads and accessories correctly incorporated (Checked by Ventry)

  • Fixings correctly positioned relative to edge of boards (Checked by Sub-Contractor)

  • Fixings correctly positioned relative to edge of boards (Checked by Ventry)

  • Specified gap maintained between adjacent boards (Checked by Sub-Contractor)

  • Specified gap maintained between adjacent boards (Checked by Ventry)

  • All edges are supported, or as required by specification/manufacturer (Checked by Sub-Contractor)

  • All edges are supported, or as required by specification/manufacturer (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Tape & Jointing

  • Taping/jointing complies with spec/manufacturers instructions (Checked by Sub-Contractor)

  • Taping/jointing complies with spec/manufacturers instructions (Checked by Ventry)

  • Correct tape used for hand or machine application (Checked by Sub-Contractor)

  • Correct tape used for hand or machine application (Checked by Ventry)

  • Faces finished to specified tolerance and surface finish (Checked by Sub-Contractor)

  • Faces finished to specified tolerance and surface finish (Checked by Ventry)

  • Required sealants correctly applied to joints (Checked by Sub-Contractor)

  • Required sealants correctly applied to joints (Checked by Ventry)

  • Finishes extend sufficiently at wall/floor/ceiling junctions (Checked by Sub-Contractor)

  • Finishes extend sufficiently at wall/floor/ceiling junctions (Checked by Ventry)

  • Reveals correctly finished around frame edges (Checked by Sub-Contractor)

  • Reveals correctly finished around frame edges (Checked by Ventry)

  • Any concealed noggins/support recorded for future fixing purposed (Checked by Sub-Contractor)

  • Any concealed noggins/support recorded for future fixing purposed (Checked by Ventry)

  • Cut outs left for future second fix service installation (Checked by Sub-Contractor)

  • Cut outs left for future second fix service installation (Checked by Ventry)

  • On completion, check for damage and any required protection (Checked by Sub-Contractor)

  • On completion, check for damage and any required protection (Checked by Ventry)

  • Areas left clean and tidy (Checked by Sub-Contractor)

  • Areas left clean and tidy (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.