Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
Back Wall
-
Line and level (Checked by Sub-Contractor)
-
Line and level (Checked by Ventry)
-
Fixings of studs and noggins (Checked by Sub-Contractor)
-
Fixings of studs and noggins (Checked by Ventry)
-
Fixing of any sheathing boards (Checked by Sub-Contractor)
-
Fixing of any sheathing boards (Checked by Ventry)
-
Thickness of any sheathing boards (Checked by Sub-Contractor)
-
Thickness of any sheathing boards (Checked by Ventry)
-
Fixing of any lining (Checked by Sub-Contractor)
-
Fixing of any lining (Checked by Ventry)
-
Allowance for movement if required (Checked by Sub-Contractor)
-
Allowance for movement if required (Checked by Ventry)
-
Sealing of joints (Checked by Sub-Contractor)
-
Sealing of joints (Checked by Ventry)
-
Corrosion/rot protection including cut ends (Checked by Sub-Contractor)
-
Corrosion/rot protection including cut ends (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Brackets and Fixings
-
Position, type, size, quantity and fixity of brackets (Checked by Sub-Contractor)
-
Position, type, size, quantity and fixity of brackets (Checked by Ventry)
-
Correct fixings (type, size, quantity, position and torque) (Checked by Sub-Contractor)
-
Correct fixings (type, size, quantity, position and torque) (Checked by Ventry)
-
Pull-out strength of fixings in to pre-existing back walls/materials (Checked by Sub-Contractor)
-
Pull-out strength of fixings in to pre-existing back walls/materials (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Support Rails
-
Position (level, plumb and plane) (Checked by Sub-Contractor)
-
Position (level, plumb and plane) (Checked by Ventry)
-
Fastening (Checked by Sub-Contractor)
-
Fastening (Checked by Ventry)
-
Allowance for movement if require (Checked by Sub-Contractor)
-
Allowance for movement if require (Checked by Ventry)
-
Corrosion protection including cut ends (Checked by Sub-Contractor)
-
Corrosion protection including cut ends (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Fire Cavity Barriers (Vertical & Horizontal)
-
Correct type (Checked by Sub-Contractor)
-
Correct type (Checked by Ventry)
-
Correct position (Checked by Sub-Contractor)
-
Correct position (Checked by Ventry)
-
Correct type of fixing, no and centres (Checked by Sub-Contractor)
-
Correct type of fixing, no and centres (Checked by Ventry)
-
Fire barrier continuous no gaps (Checked by Sub-Contractor)
-
Fire barrier continuous no gaps (Checked by Ventry)
-
Free from damage (Checked by Sub-Contractor)
-
Free from damage (Checked by Ventry)
-
Cavity barrier compressed between inner and outer leaf (Checked by Sub-Contractor)
-
Cavity barrier compressed between inner and outer leaf (Checked by Ventry)
-
Cavity barrier cut into insulation (Checked by Sub-Contractor)
-
Cavity barrier cut into insulation (Checked by Ventry)
-
Horizontal DPC positioned above any horizontal cavity barrier (Checked by Sub-Contractor)
-
Horizontal DPC positioned above any horizontal cavity barrier (Checked by Ventry)
-
Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Sub-Contractor)
-
Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Insulation and Tape
-
Type (Checked by Sub-Contractor)
-
Type (Checked by Ventry)
-
Thickness (Checked by Sub-Contractor)
-
Thickness (Checked by Ventry)
-
Completeness (Checked by Sub-Contractor)
-
Completeness (Checked by Ventry)
-
Fit and seal penetrations (Checked by Sub-Contractor)
-
Fit and seal penetrations (Checked by Ventry)
-
Security (to resist wind suction if in cavity) (Checked by Sub-Contractor)
-
Security (to resist wind suction if in cavity) (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Breather Membrane
-
Type of material (Checked by Sub-Contractor)
-
Type of material (Checked by Ventry)
-
Orientation of material (Checked by Sub-Contractor)
-
Orientation of material (Checked by Ventry)
-
Lap of material (Checked by Sub-Contractor)
-
Lap of material (Checked by Ventry)
-
Damage (Checked by Sub-Contractor)
-
Damage (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Cavities
-
Clearance for drainage and ventilation (Checked by Sub-Contractor)
-
Clearance for drainage and ventilation (Checked by Ventry)
-
Provision of any specified cavity closures (Checked by Sub-Contractor)
-
Provision of any specified cavity closures (Checked by Ventry)
-
Provision of any required fire/smoke stops (Checked by Sub-Contractor)
-
Provision of any required fire/smoke stops (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Rainscreen Panels
-
Position and joint width (Checked by Sub-Contractor)
-
Position and joint width (Checked by Ventry)
-
Flatness (Checked by Sub-Contractor)
-
Flatness (Checked by Ventry)
-
Colour (Checked by Sub-Contractor)
-
Colour (Checked by Ventry)
-
Gloss or texture (Checked by Sub-Contractor)
-
Gloss or texture (Checked by Ventry)
-
Correct fixings/fasteners (type, size, quantity, position and torque) (Checked by Sub-Contractor)
-
Correct fixings/fasteners (type, size, quantity, position and torque) (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: