Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

Back Wall

  • Line and level (Checked by Sub-Contractor)

  • Line and level (Checked by Ventry)

  • Fixings of studs and noggins (Checked by Sub-Contractor)

  • Fixings of studs and noggins (Checked by Ventry)

  • Fixing of any sheathing boards (Checked by Sub-Contractor)

  • Fixing of any sheathing boards (Checked by Ventry)

  • Thickness of any sheathing boards (Checked by Sub-Contractor)

  • Thickness of any sheathing boards (Checked by Ventry)

  • Fixing of any lining (Checked by Sub-Contractor)

  • Fixing of any lining (Checked by Ventry)

  • Allowance for movement if required (Checked by Sub-Contractor)

  • Allowance for movement if required (Checked by Ventry)

  • Sealing of joints (Checked by Sub-Contractor)

  • Sealing of joints (Checked by Ventry)

  • Corrosion/rot protection including cut ends (Checked by Sub-Contractor)

  • Corrosion/rot protection including cut ends (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Brackets and Fixings

  • Position, type, size, quantity and fixity of brackets (Checked by Sub-Contractor)

  • Position, type, size, quantity and fixity of brackets (Checked by Ventry)

  • Correct fixings (type, size, quantity, position and torque) (Checked by Sub-Contractor)

  • Correct fixings (type, size, quantity, position and torque) (Checked by Ventry)

  • Pull-out strength of fixings in to pre-existing back walls/materials (Checked by Sub-Contractor)

  • Pull-out strength of fixings in to pre-existing back walls/materials (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Support Rails

  • Position (level, plumb and plane) (Checked by Sub-Contractor)

  • Position (level, plumb and plane) (Checked by Ventry)

  • Fastening (Checked by Sub-Contractor)

  • Fastening (Checked by Ventry)

  • Allowance for movement if require (Checked by Sub-Contractor)

  • Allowance for movement if require (Checked by Ventry)

  • Corrosion protection including cut ends (Checked by Sub-Contractor)

  • Corrosion protection including cut ends (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Fire Cavity Barriers (Vertical & Horizontal)

  • Correct type (Checked by Sub-Contractor)

  • Correct type (Checked by Ventry)

  • Correct position (Checked by Sub-Contractor)

  • Correct position (Checked by Ventry)

  • Correct type of fixing, no and centres (Checked by Sub-Contractor)

  • Correct type of fixing, no and centres (Checked by Ventry)

  • Fire barrier continuous no gaps (Checked by Sub-Contractor)

  • Fire barrier continuous no gaps (Checked by Ventry)

  • Free from damage (Checked by Sub-Contractor)

  • Free from damage (Checked by Ventry)

  • Cavity barrier compressed between inner and outer leaf (Checked by Sub-Contractor)

  • Cavity barrier compressed between inner and outer leaf (Checked by Ventry)

  • Cavity barrier cut into insulation (Checked by Sub-Contractor)

  • Cavity barrier cut into insulation (Checked by Ventry)

  • Horizontal DPC positioned above any horizontal cavity barrier (Checked by Sub-Contractor)

  • Horizontal DPC positioned above any horizontal cavity barrier (Checked by Ventry)

  • Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Sub-Contractor)

  • Vertical DPC should be positioned between vertical cavity barrier and masonry outer leaf (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Insulation and Tape

  • Type (Checked by Sub-Contractor)

  • Type (Checked by Ventry)

  • Thickness (Checked by Sub-Contractor)

  • Thickness (Checked by Ventry)

  • Completeness (Checked by Sub-Contractor)

  • Completeness (Checked by Ventry)

  • Fit and seal penetrations (Checked by Sub-Contractor)

  • Fit and seal penetrations (Checked by Ventry)

  • Security (to resist wind suction if in cavity) (Checked by Sub-Contractor)

  • Security (to resist wind suction if in cavity) (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Breather Membrane

  • Type of material (Checked by Sub-Contractor)

  • Type of material (Checked by Ventry)

  • Orientation of material (Checked by Sub-Contractor)

  • Orientation of material (Checked by Ventry)

  • Lap of material (Checked by Sub-Contractor)

  • Lap of material (Checked by Ventry)

  • Damage (Checked by Sub-Contractor)

  • Damage (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Cavities

  • Clearance for drainage and ventilation (Checked by Sub-Contractor)

  • Clearance for drainage and ventilation (Checked by Ventry)

  • Provision of any specified cavity closures (Checked by Sub-Contractor)

  • Provision of any specified cavity closures (Checked by Ventry)

  • Provision of any required fire/smoke stops (Checked by Sub-Contractor)

  • Provision of any required fire/smoke stops (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence recorded

Rainscreen Panels

  • Position and joint width (Checked by Sub-Contractor)

  • Position and joint width (Checked by Ventry)

  • Flatness (Checked by Sub-Contractor)

  • Flatness (Checked by Ventry)

  • Colour (Checked by Sub-Contractor)

  • Colour (Checked by Ventry)

  • Gloss or texture (Checked by Sub-Contractor)

  • Gloss or texture (Checked by Ventry)

  • Correct fixings/fasteners (type, size, quantity, position and torque) (Checked by Sub-Contractor)

  • Correct fixings/fasteners (type, size, quantity, position and torque) (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.