Information

  • Type of dam: Concrete faced zoned earth fill with synthetic liner and cover

  • Dam height: 13.80m

  • FSL Gauge board: 5.02m

  • FSL mAHD: 234.32

  • Capacity at FSL 28 ML

  • Type of spillway: Drop weir

  • Client / Site

  • Conducted on

  • Last Inspection conducted

  • Prepared by

  • Location
  • Inspection Party

  • Inspection Party

Operational Status at time of inspection

  • Volume taken by treatment plant in 24hrs to 8:00am

  • release via spillway

  • Other Comments

  • Photos

  • Sketch of deficincies

  • Select date

Conditions at time of inspection

  • Weather

  • Estimated Max Temperature degrees celsius

  • Sky

  • Wind

  • Rain

  • Days since last rain

  • Other Comments

Dam Safety Management

  • O&M Manual on Site

  • O&M Manual Reviewed

  • Dam Safety Emergency Plan on Site

  • Dam Safety Emergency Plan reviewed

  • Drawings on site

  • Operator Training

  • Operator Knowledge

  • Other Comments

Crest

  • Cracks

  • Vegetation

  • Sink Holes

  • Subsidence

  • Overtopping

  • Wheel ruts

  • Other deficiencies/comments for the crest.

  • Take photos of any deficiencies found on crest

  • Add drawing

Downstream Face

  • Cracks

  • Slips

  • Erosion

  • Vegetation

  • Animal Activity

  • Bulges

  • Subsidence

  • Seepage

  • Other deficiencies/comments for the downstream face

  • Take photos of any deficiencies found on downstream slope

  • Add drawing

Upstream Face

  • Rock facing

  • Concrete

  • Dwarf wall

  • Security fence

  • Take photos of any deficiencies found on upstream face

  • Other deficiencies/comments for the upstream face

Abutments

  • Slips

  • Cracks

  • Seepage

  • Erosion

  • Vegetation

  • Subsidence

  • Take any photos of abutment observations

  • Other deficiencies/comments for abutments

Area Downstream of Dam

  • Slips

  • Seepage

  • Bulges

  • Vegetation

  • Comments

  • Photos

  • Sketch

Catch Drain

  • Vegetation

  • Debris

  • Tunnel

  • Stormwater inlets

  • Other comments

  • Photos

  • Sketch

Reservoir Outfall

  • Vegetation

  • Erosion

  • Penstock Valves

  • Channel Downstream of Chandlers Hill Road

  • Trash Screen

  • Outfall Channel Culvert

  • Debris deflection posts

  • Other comments

  • Photos

  • Sketch

Outlet Tower 1

  • Downstream valve 24" (kh sv10)

  • Last time operated

  • Scout valve 10" (kh sv7)

  • Last time operated

  • Other comments

  • Photos

  • Sketch

Tunnel Downstream of outlet tower

  • Tunnel portal

  • Tunnel Structure

  • Other Comments

  • Photos

  • Sketch

Scour Tower

  • Internal walls

  • Leakage

  • Pipework

  • Valves

  • Inlet Screens

  • Internal access

  • External access

  • Security

  • Superstructure

  • Electrical

  • Trolley Crane

  • lighting

  • Ventilation

  • Other comments

  • Photos

  • Sketch

Scour Tunnel

  • Concrete lining

  • Shotcrete

  • Tunnel plug

  • Pipework

  • Lighting

  • Access

  • Other Comments

  • Photos

  • Sketch

Outlet Works Operation

Outlet works

  • Screen

  • Pipework

  • Valves

  • Photos

  • Outlet works comments

Inlet Works

Inlet Works

  • Old concrete chute

  • New inlet chute

  • HDPE inlet pipe

  • Baffle walls

  • Screen

  • Erosion

  • Other comments

  • Photos

Access to Dam

  • Right Abutment

  • Left abutment

  • Other access to dam notes

  • Sketch

  • Access to dam photos

Reservoir

  • Landslips around rim

  • Boat Ramp

  • Other comments

  • Sketch

  • Photos

Communications

  • Telemetry

  • Telephones

  • Radios

  • Other comments

  • Sketch

  • Photos

Power Supply

  • Standby

  • Normal

  • Other comments

  • Sketch

  • Photos

Instrumentation

  • Underdrain V notch weir

  • Underdrain V notch weir reading mm

  • Scour Tunnel v notch weir

  • Scour tunnel V notch weir reading mm

  • Pneumatic Piezometers

  • Vibrating Wire Piezometers

  • Inclinometers

  • Extensometers

  • Survey Marks

  • Survey Pillars

  • Gauge board

  • Other comments

  • Photos

  • Sketch

Surveillance

  • Rainfall

  • Rainfall observation frequency meets ANCOLD guidelines

  • Storage Level

  • Storage Level Observation frequency meets ANCOLD guidelines

  • Seepage

  • Seepage Observation frequency meets ANCOLD guidelines

  • Seepage Analysis

  • Seepage Analysis observation frequency meets ANCOLD guidelines

  • Pore Water Pressure

  • Pore water pressure observation frequency meets ANCOLD guidelines

  • Surface Displacement

  • Surface Displacement observation frequency meets ANCOLD guidelines

  • Internal displacement

  • Internal displacement observation frequency meets ANCOLD guidelines

  • Seismological

  • Seismological observation frequency meets ANCOLD guidelines

  • Telemetry

  • Telemetry observation frequency meets ANCOLD guidelines

  • Visual Inspections

  • Visual Inspection observation frequency meets ANCOLD guidelines

  • Other comments

Geomembrane Liner and Cover

  • Liner

  • Cover

  • Stormwater drainage

Spillway

  • Chamber

  • Pipe

  • Erosion protection

  • Overflow outlet to creek

  • Aluminium flap on overflow

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.