Information
-
Type of dam: Concrete faced zoned earth fill with synthetic liner and cover
-
Dam height: 13.80m
-
FSL Gauge board: 5.02m
-
FSL mAHD: 234.32
-
Capacity at FSL 28 ML
-
Type of spillway: Drop weir
-
Client / Site
-
Conducted on
-
Last Inspection conducted
-
Prepared by
-
Location
-
Inspection Party
-
Inspection Party
- Peter Tsoukalas, Senior Asset Planner Dams headworks
- Stewart Dahms, Acting Asset Plann Dams Headworks
- Eric Pepe, C&M Millbrook
- Alex Przygoda, C&M Millbrook
- Robert Poole, Asset Planner Dams Headworks
Operational Status at time of inspection
-
Volume taken by treatment plant in 24hrs to 8:00am
-
release via spillway
-
Other Comments
-
Photos
-
Sketch of deficincies
-
-
-
Select date
Conditions at time of inspection
-
Weather
-
Estimated Max Temperature degrees celsius
-
Sky
-
Wind
-
Rain
-
Days since last rain
-
Other Comments
Dam Safety Management
-
O&M Manual on Site
-
O&M Manual Reviewed
-
Dam Safety Emergency Plan on Site
-
Dam Safety Emergency Plan reviewed
-
Drawings on site
-
Operator Training
-
Operator Knowledge
-
Other Comments
Crest
-
Cracks
-
Vegetation
-
Sink Holes
-
Subsidence
-
Overtopping
-
Wheel ruts
-
Other deficiencies/comments for the crest.
-
Take photos of any deficiencies found on crest
-
Add drawing
Downstream Face
-
Cracks
-
Slips
-
Erosion
-
Vegetation
-
Animal Activity
-
Bulges
-
Subsidence
-
Seepage
-
Other deficiencies/comments for the downstream face
-
Take photos of any deficiencies found on downstream slope
-
Add drawing
Upstream Face
-
Rock facing
-
Concrete
-
Dwarf wall
-
Security fence
-
Take photos of any deficiencies found on upstream face
-
Other deficiencies/comments for the upstream face
Abutments
-
Slips
-
Cracks
-
Seepage
-
Erosion
-
Vegetation
-
Subsidence
-
Take any photos of abutment observations
-
Other deficiencies/comments for abutments
Area Downstream of Dam
-
Slips
-
Seepage
-
Bulges
-
Vegetation
-
Comments
-
Photos
-
Sketch
Catch Drain
-
Vegetation
-
Debris
-
Tunnel
-
Stormwater inlets
-
Other comments
-
Photos
-
Sketch
Reservoir Outfall
-
Vegetation
-
Erosion
-
Penstock Valves
-
Channel Downstream of Chandlers Hill Road
-
Trash Screen
-
Outfall Channel Culvert
-
Debris deflection posts
-
Other comments
-
Photos
-
Sketch
Outlet Tower 1
-
Downstream valve 24" (kh sv10)
-
Last time operated
-
Scout valve 10" (kh sv7)
-
Last time operated
-
Other comments
-
Photos
-
Sketch
Tunnel Downstream of outlet tower
-
Tunnel portal
-
Tunnel Structure
-
Other Comments
-
Photos
-
Sketch
Scour Tower
-
Internal walls
-
Leakage
-
Pipework
-
Valves
-
Inlet Screens
-
Internal access
-
External access
-
Security
-
Superstructure
-
Electrical
-
Trolley Crane
-
lighting
-
Ventilation
-
Other comments
-
Photos
-
Sketch
Scour Tunnel
-
Concrete lining
-
Shotcrete
-
Tunnel plug
-
Pipework
-
Lighting
-
Access
-
Other Comments
-
Photos
-
Sketch
Outlet Works Operation
Outlet works
-
Screen
-
Pipework
-
Valves
-
Photos
-
Outlet works comments
Inlet Works
Inlet Works
-
Old concrete chute
-
New inlet chute
-
HDPE inlet pipe
-
Baffle walls
-
Screen
-
Erosion
-
Other comments
-
Photos
Access to Dam
-
Right Abutment
-
Left abutment
-
Other access to dam notes
-
Sketch
-
Access to dam photos
Reservoir
-
Landslips around rim
-
Boat Ramp
-
Other comments
-
Sketch
-
Photos
Communications
-
Telemetry
-
Telephones
-
Radios
-
Other comments
-
Sketch
-
Photos
Power Supply
-
Standby
-
Normal
-
Other comments
-
Sketch
-
Photos
Instrumentation
-
Underdrain V notch weir
-
Underdrain V notch weir reading mm
-
Scour Tunnel v notch weir
-
Scour tunnel V notch weir reading mm
-
Pneumatic Piezometers
-
Vibrating Wire Piezometers
-
Inclinometers
-
Extensometers
-
Survey Marks
-
Survey Pillars
-
Gauge board
-
Other comments
-
Photos
-
Sketch
Surveillance
-
Rainfall
-
Rainfall observation frequency meets ANCOLD guidelines
-
Storage Level
-
Storage Level Observation frequency meets ANCOLD guidelines
-
Seepage
-
Seepage Observation frequency meets ANCOLD guidelines
-
Seepage Analysis
-
Seepage Analysis observation frequency meets ANCOLD guidelines
-
Pore Water Pressure
-
Pore water pressure observation frequency meets ANCOLD guidelines
-
Surface Displacement
-
Surface Displacement observation frequency meets ANCOLD guidelines
-
Internal displacement
-
Internal displacement observation frequency meets ANCOLD guidelines
-
Seismological
-
Seismological observation frequency meets ANCOLD guidelines
-
Telemetry
-
Telemetry observation frequency meets ANCOLD guidelines
-
Visual Inspections
-
Visual Inspection observation frequency meets ANCOLD guidelines
-
Other comments
Geomembrane Liner and Cover
-
Liner
-
Cover
-
Stormwater drainage
Spillway
-
Chamber
-
Pipe
-
Erosion protection
-
Overflow outlet to creek
-
Aluminium flap on overflow
-
Add media