Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site Manager
-
Ganger
Work areas
-
Requested materials to fixers
-
Plant issued as per allocation sheet
-
Cutting area barriered off
-
Adequate labour
-
Trailing leads signage
-
Protection signage
-
Noisy works, ear protection signage & earplugs available
-
Housekeeping in order
-
Post work protection and material
-
Potential hazards
Storage areas
-
Barriered off
-
Radii signage
-
Clean and tidy
-
Toolboxes present and noted
-
Glass edges protected
-
SWL noted on stillage
Storage areas - Materials
-
Stored in allocated area
-
Adequate storage size
-
Glass panel edges protected
-
Tracks on Christmas tree
-
Fixings in toolbox
-
Damaged materials recorded and issued to Radii
-
COSHH stored safely
Protection
-
Correct quantities available
-
Correct material used
-
Neat and tidy
-
Photo evidence sent to Radii
-
Tape on glass until protected
Waste
-
Plasterboard segregated
-
Bins all locked
-
Waste removed frequently
Operatives
-
Radii T-shirts
-
Clean and tidy
-
Correct PPE worn
-
Issues
-
Awareness of responsibilities
-
Any pay issues
PPE
-
PPE issued and signed for
-
Spare PPE availability
PPE - All operatives wearing correct PPE
-
Hard Hat
-
Glasses/goggles
-
Hi-vis vest
-
Sleeve protection
-
Gloves
-
Safety boots
Toolbox
-
Fixers toolboxes managed
-
Clean and tidy
-
Safe and secure
-
Correct tools in correct toolbox
-
First aid kit spares box
Managing Plant & Equipment
-
A-frames available
-
Stillages
-
Podiums - safe and scaff tagged
-
Bench saw
-
Safe use but trained operatives
Radii Paperwork
-
Method statement signed by all operatives
-
Risk assessments attached
-
Manual handling attached
-
COSHH attached
-
Inductions filled in
-
Matrix up to date
-
CSCS card copies for all operatives
-
Relevant certificates
-
First aid certificates
-
Toolbox talks
-
PAT test register
-
PUWER register
-
Tower inspections
-
PPE issue log
-
Accident book
-
Delivery notes
-
Waste notes
LL Paperwork
-
Timesheet completed
-
Sent to Radii
-
Allocation sheets completed
-
Allocation sheets available to Radii
Delivery Management
-
Awareness of logistics/fire plan
-
Booking deliveries
-
Management of deliveries
-
Daily reports produced
Fire Safety
-
Emergency lighting
-
Temp alarm (control/tests)
-
Muster Point (clearly identified)
-
Duties in case of emergency
Fire Safety - Fire Exits
-
Clear
-
Signage in place
Fire Safety - Smoke Detectors
-
Isolations/Re-instatements
-
Covers
Fire Safety - Fire Points
-
Bell or alarm in place
-
Sign displayed with firepoint
Level of Knowledge
-
Site daily activities
-
Risk management
-
Health & safety issues
Environment
-
Dust control
-
Noise control
H&S Auditing and Inspections
-
CM H&S Audits (2 per month)
-
LL actions for previous audits actioned
-
Weekly Radii site report
Access & Egress
-
Safe walkway to welfare facilities
Welfare facilities
-
As required by law
-
Safe (away from works)
COSHH Storage
-
Dry area allocated for COSHH materials
-
Correct disposal of COSHH materials
Mobile Towers
-
Safe to use
-
Scaff tags available
-
Scaff tags updated every 7 days
Lighting
-
Temporary lighting
Signage
-
All signs required by law are displayed
Trip hazards
-
Removed if possible
-
Highlighted if not possible to remove
-
Signage displayed to identify it
Loading Bay
-
Banksman for reversing deliveries
-
Separated from pedestrians
-
Fire point
Other
-
Work at height assessment
-
Signed safety policy/plan
First Aid
-
First aid kit displayed for easy access
-
First aid kit refilled if used (weekly)
-
Eye wash available
ADDITIONAL COMMENTS
-
Details:
ISSUES TO BE REPORTED ON SHE ONLINE
-
ISSUE 1
-
ISSUE 2
-
ISSUE 3
-
ISSUE 4
-
ISSUE 5
-
Signature of Auditor:
-
Signature of LL Supervisor on site: