Has a condition survey of the trapezoidal panels been undertaken and submitted to the client?
-
Are GL'S in place?
-
Are QA's for brackets, rails and insulation complete?
-
Are works in conjunction with the latest drawings?
-
HOLD POINT
-
Have panels been adequately cleaned and waste been disposed of sensibly before being reinstalled onto the wall?
-
Have fire barriers been installed to the necessary areas? Have these been checked and recorded on both Bolster and iAuditor?
-
Has a flat plate to retain the fire barrier into the back of the panel been installed?
-
Are fixings installed 2ith adequate edge distances?
-
Are panels plumb and level as well as aligned with adjacent panels?
-
HOLD POINT
-
Has the flashing been installed to the correct level to suit the existing panels?
-
Are the adjacent flashings in line with each other?
-
Are the fixing centres to the dimensions of the latest drawings?
-
Are all fixings in correlation of the latest fixing schedule?