Title Page

  • Conducted on

  • Prepared by

  • Location

  • Has a condition survey of the trapezoidal panels been undertaken and submitted to the client?

  • Are GL'S in place?

  • Are QA's for brackets, rails and insulation complete?

  • Are works in conjunction with the latest drawings?

  • HOLD POINT

  • Have panels been adequately cleaned and waste been disposed of sensibly before being reinstalled onto the wall?

  • Have fire barriers been installed to the necessary areas? Have these been checked and recorded on both Bolster and iAuditor?

  • Has a flat plate to retain the fire barrier into the back of the panel been installed?

  • Are fixings installed 2ith adequate edge distances?

  • Are panels plumb and level as well as aligned with adjacent panels?

  • HOLD POINT

  • Has the flashing been installed to the correct level to suit the existing panels?

  • Are the adjacent flashings in line with each other?

  • Are the fixing centres to the dimensions of the latest drawings?

  • Are all fixings in correlation of the latest fixing schedule?

Sign off

  • A2O Representative

  • Subcontractors Supervisor Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.