Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • Check that wall and truss framing has not been damaged. during delivery

  • Roof Constructed as per approved layout

  • If laminated Truss are required to nail together, please check this has been done as per manufacturer details

  • Eave Overhang<br>F.F 450 mm from Stud wall/G.F 600 MM FROM Stud Wall uno

  • Bottom chord clear of non-Load bearing walls (20 mm Gap)

  • Check Slotted Bracket install Roof truss to non-load bearing wall 1800 mm interval- Nail install top to slotted holes and loose fit only

  • Check double hip battens to hexagon areas of house (refer to standard detail)

  • Ensure outriggers are installed to hexagon areas to pick up fascia & gutter

  • Roof Bracing Looped over & nailed to u/s of top plate

  • Box gutter boards and valley boards in place

  • Ensure the hoop iron over the garage wall must be nail to top plate

  • Any strap Bracing not running across the sky light locations

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.