  • Has Development Consent being obtained

  • Are there any statutory, regulatory, or other legal impediments to the demolition of the building

  • Has the owner/principal identified all hazardous substances located on site including asbestos, PCBs, lead paint, underground storage tanks, chemicals, etc. as per Clause 1.6.12 of AS2601-2001?

  • Has the owner/principal obtained permission to occupy adjoining neighbours’ property, including airspace, for the purpose of erecting protective scaffold/screens for the demolition works?

  • Has the owner/principal provided all existing architectural, services and engineering drawings available for the demolition project?

  • Identify the structural system and check its elements for deterioration: (i) elements resisting vertical loads (floors, beams, columns, walls); and ‰ (ii) elements resisting horizontal loads (service cores, shear walls, braced frames, rigid frames)

  • From the drawings provided, identify and locate service supply mains (water, electricity, gas) and extent of reticulations

  • Identify and locate emergency services (fire detection and fire fighting)

  • Establish nature, location and extent of other services (sewerage, drainage, airconditioning, lifts).

  • Identify and locate underground services and their points of entry to and exit from the site

  • Determine levels of basements, cellars and other underground areas relative to:‰ (i) site personnel; and ‰ (ii) demolition

  • Identify retaining structures providing support to adjoining properties

  • Determine the location, nature and condition of all hazardous substances identified in the Hazardous Substances Audit (see Clause 1.6.1 of AS2601-2001).

  • Determine most suitable points of egress from the site for - ‰ (i) site personnel; and ‰ (ii) demolition equipment and routes for removal of demolished materials.

  • Examine and record the condition of buildings on the adjoining sites, particularly where these abut a common boundary

  • Develop overall procedure based on investigations

  • Develop a level-by-level- procedure for stripping, breaking-up and removal of stripped and demolished materials

  • From the level-by-level procedure, determine nature, number and sizes of mechanical equipment, and number and skills of personnel to be deployed on the working level

  • Obtain advice from a structural engineer on whether structure of working level can safely sustain proposed loads, and if not, modify proposed procedures accordingly

  • Ascertain what restrictions are imposed on working hours, use of public thoroughfares, noise level, and the like

  • Prepare detailed work plan, including a time chart, in accordance with Clause 2.3 of AS2601-2001

  • Obtain approval for the work plan, if structure is greater than six (6) metres in height

  • Obtain all necessary permits and approvals and give all required notices

  • Secure site boundaries with fences or hoardings as appropriate

  • Establish permanent and emergency entrances and exits

  • Fully inform all site personnel of the work plan, and safety procedures, and establish procedures for dealing with emergencies (accidents, fires)

  • Ensure that all necessary plant, equipment and tolls are available and in good working order

  • All openings and elevated free edges are properly guarded

  • Any temporary bracing, shoring, or propping is tight, stable and secure

  • All fire and safety services are operational and all other services to the working level have been properly disconnected

  • All hazardous substances have been removed from the working level and disposed to the correct waste management facility

  • Lines of communication to Dapcors Supervisor/Foreman are clear and operational

  • All emergency access routes are clear of debris and clearly marked

Final Inspection

  • Subontractor:

  • Subcontractors Signature:

  • Date:

  • Dapcor Representative Name:

  • Dapcor Representative Signature:

  • Date:

Photos

  • Photo 1

  • Photo 2

  • Photo 3

  • Photo 4

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.